
ADEME-backed programme with La Fabrique des Mobilités: 30 light electric vehicles deployed across pilot sites, instrumented, and analysed — paving the way for scale-up.
At a glance
30 LEV is an ADEME-backed programme run by La Fabrique des Mobilités. Between 2023 and 2026 it field-tests 30 light electric vehicles (LEVs) on several pilot sites, collects high-resolution usage data, and publishes open-source lessons to pave the way for a larger roll-out (300 LEV).
Context and goals
Why light electric vehicles?
LEVs bridge the gap between bikes and cars: compact, electric-powered and affordable — ideal for short daily trips where a full-size car is overkill.
Project origins
- Spring–Summer 2023 — concept note, budget and agreement with ADEME.
- Embedded in the eXtrême Défi roadmap for territories and trials.
Objectives
- Prove the technical and economic viability of LEV fleets.
- Create reusable documentation (contracts, dashboards, data).
- Prepare the scale-up programme 300 LEV.
Timeline
| Period | Key milestones |
|---|---|
| Mid-2023 | Project design and ADEME contract; call for manufacturers |
| H2 2023 | Sourcing the 30 LEVs; agreements with local hosts; first units on the road |
| 2024 | Programme management and reporting; telematics roll-out and data pipeline; public GitHub repo fabmob/dataviz-30-lev |
| Late 2024 – 2025 | Usage analytics and environmental KPIs; scenarios for post-trial reuse; scoping study for 300 LEV |
| Early 2026 | Final synthesis, webinars, open-data release |
Telematics and data visualisation
To capture real-world usage we specified an end-to-end telematics stack:
- Hardware: GNSS + 4G low-power boxes, easily removable.
- Data: position, speed, battery cycles (where the vehicle bus exposed them), odometer.
- Backend: MQTT → TimescaleDB → REST API.
- Visuals: open dashboards at https://github.com/fabmob/dataviz-30-lev.
My role
| Phase | Contribution |
|---|---|
| Design (mid-2023) | Concept note, budget, KPI negotiation with ADEME |
| Kick-off (H2 2023) | Manufacturer call, legal and insurance framework |
| 2024 | Programme lead, steering committees, logistics |
| Telematics & analytics | Spec, vendor selection, repo supervision |
| 2025 | Reuse scenarios, scale-up study 300 LEV |